Passive solar tent - demonstration project built by students at University of Witwatersrand in 1979
1
The finished tent with 3 of the students that built it.
2
Structure of scaffold poles with cables supporting a waterproofed fabric roof.
3
The tent was allowed to stand for 6 months on its temporary site, while temperatures inside were monitored.
4
Day 1 - Model of net and supports loaded to show deformation
5
Day 1 - Side view of model
6
Day 1 - Turn ing the first sod (the site had to be restored to its original state at the end of the project)
7
Day 2 - Assembly of the scaffold pole frame
8
Day 2 - Frame in position
9
Day 3 - Fixing the net
10
Day 3 - Fabrication of windows and doors in workshop
11
Day 4 - The building team after finishing the dry ground slab and block walls
12
Day 4 - Frame with hangers to support flexible roof and ceiling with insulation -side panel installed on dry block wall
13
Day 4 - Frame with hangers to support flexible roof and ceiling with insulation -side panel installed on dry block wall
14
Day 4 - Tent roof being hung
15
Day 5 - Tent roofed
16
Day 5 - Roof membrane tensioned and fixed to edges.
17
Day 5 - Cords tensioning roof membrane through waterproofed reinforced holes to suspend insulated ceiling
18
Day 5 - Roof tensioned and fixed to edges.
19
Day 5
20
Day 5 - work on interior
21
Day 5 evening - ceiling suspended
22
Day 6 - joinery
23
Day 6 - joinery of windows and tanks installed
24
Day 6 - Interior
25
Day 6 - Interior
26
Weeks later
27
Day 6 - water storage tanks and spectators